Submittal Spec Compliance Check

Pre-check a product submittal against its spec section

Price

¥1,500

One-time purchase. Download immediately. Works in the assistant you already have.

Buy for ¥1,500
  • One-time purchase. Sold through Link, a Stripe company that acts as merchant of record; taxes are handled at checkout.
  • Priced in JPY; you may be charged in your local currency.

A draft and first-pass check. Have the responsible person review the result before acting on it.

Give it a specification section and a submittal package. It extracts the requirements, compares each with the submittal, quotes the spec line and page, lists missing submittal items and drafts review comments for the design professional to decide on.

Does this submittal from our sub actually meet the spec section, and what should we send back to them?

For this one task you may not need a subscription: this agent file does it in the AI assistant you already use, for a one-time price.

What it covers: The submittal review step that construction platforms route and some AI agents pre-check, for general contractors and project managers.

What it does not replace:

  • It does not approve submittals; the design professional does
  • It cannot read poor scans or detailed drawings reliably

Need those? Compare the software: AI Construction Management Software Comparison 2026

What it does

  • Extracts a numbered requirement list from the spec section
  • Marks each requirement complies, deviates or not shown with quotes and pages
  • Compares numeric values with units side by side
  • Drafts review comments by severity for the reviewer to edit

What you give it

  • Specification section text or PDF
  • Submittal package
  • Addenda or approved substitutions

What you get back

  • Requirement checklist with status
  • Missing submittal items
  • Draft review comments
  • Counts and list of what could not be checked

How it works

  1. Read the whole section
  2. Apply the addenda and approved substitutions the user supplied
  3. Show the numbered requirement list to the user in compact form
  4. For each requirement, search the submittal for evidence and quote it with the page
  5. For numeric requirements, write both values with units in one line, for example "required 90 min, shown 90…
  6. Check the standards named in the spec
  7. Check the submittal items required by the spec…
  8. Draft review comments for the reviewer to edit, grouped by severity
  9. Finish with counts and a reminder that the design professional decides

What it cannot do

  • It does not approve submittals; the design professional does
  • It cannot read poor scans or detailed drawings reliably
  • It has no routing, stamps or submittal log

Works with

  • Claude (Projects)
  • ChatGPT (Projects)
  • Claude Code
How to load the file into your assistant →

Needs

  • File upload

Best for

General contractors and project engineers who pre-check submittals before design review.

Who made this

Made by
AIpedia Editorial Team
Version
1.0.0
Updated

AIpedia's editors wrote this agent and reviewed it before it was listed.

Editors' review: 12 / 15

Usefulness
4 / 5
Depth of method
4 / 5
Clarity of output
4 / 5

Scored by AIpedia's editors when they reviewed the file: usefulness, depth of method, clarity of output. It decides the order on this site until there are sales.

Comparing software for this job? See AI Construction Management Software Comparison 2026

More agents for AI Construction Management Software →Agents for Operations and supply chain →

Other agents for this task

Licence and refunds

One purchase covers one person or one organisation. You may edit your copy for that use; you may not resell it or share it outside your organisation. If the file does not do what this page says, tell us, ideally within 14 days, and we will fix it or refund you.

Read the terms of sale and licence →